Building Stages
Live the Losani Lifestyle!
Quality craftsmanship
Intelligent design
Superior value
What can you expect when buying a new home from Losani Homes?
The experience of having your home built should be a wonderful event.
At Losani Homes it is our aim to deliver a superior finished product for
you and your family. We want you to enjoy the development of your dream,
every step of the way.
The process of constructing a home is very complex, so we want you to
understand the various stages that your home will go through. By understanding
at what point in the progress your home is in, you will have a better idea
of just how much has gone into the development of your home.
Stage 1 - Final Drawings Submitted for Permit
Our experienced staff of in-house architects and construction coordinators
will work with the client and sales staff to finalize the house drawings
so that a completed permit application package may be submitted to the
proper municipalities. Permit is usually received four to six weeks after
submission.
Stage Two - Foundation
At this stage, the footprint of your new home is excavated and leveled.
Underground drainage and vapor barrier is put place. A Pre-foundation pour
inspection is completed. After the inspection is approved the foundation
is poured and the foundation is back-filled.
Stage Three - Framing and Roofing
Framing is completed. This includes the walls, roof trusses, and roofing
installation. After the roof has been installed the installation of the
weather protect ant shingles will begin. Time required to complete this
stage varies based on your home’s size and complexity.
Stage Four - Windows and Doors
The next stage of the building process is to enclose the house by installing
the windows and doors.
Stage Five - Exterior Bricking/Siding
Upon completion of the framing stage your new home is ready to be bricked
and sided. Using quality crafted clay brick and superior weather resistant
siding the exterior of your home is finished with attention to detail and
architectural quality.
Stage Six - Rough In
Mechanical and electrical roughs are also started after at approximately
the same time as the Exterior Bricking/Siding stage. All wires are pulled
throughout home, including cable outlets and telephone lines. Also completed
during this stage is the installation of the mechanical duct work and running
of the plumbing lines.
Stage Seven - Interior Walls
Once the Framing and mechanical inspections are done and approved insulation
and drywall are started. Proper insulation is critical in ensuring proper
home cooling and heating. The drywall is installed, taped and sanded in
preparation for priming and painting.
Stage Eight - Ceramic and Hardwood Flooring
Once the interior drywall is completed any hardwood and ceramic applicable
to your house design will be installed.
Stage 9 - Kitchen and Bathroom Cabinets and Counters
The cabinets for the kitchen and bathrooms are installed.
Stage Ten - Trim Detailing
During this stage interior painting and baseboard installation occurs.
Interior door casings and doors are installed as was as any molding. Staircase
railing and balusters are installed and stained.
Stage 11 - Mechanical Electrical and Plumbing Finishes
The builder will install the heating and air conditioning and the vents.
The electrician will return and install all light fixtures, wall outlets,
switches and cover plates. Now that the cabinets are in, the plumber will
return and install sinks, toilets and faucets. The plumber will also install
the water heater if it was not installed during rough plumbing.
Stage 12 - Carpet Installed
Now that interior portion of the house is virtually complete your new
home will be ready for carpet to be installed.
Stage 13 Final Clean
Each home is cleaned and detailed by individuals familiar with the unique
requirements of cleaning newly constructed homes.
Stage 14 - Quality Assurance Check
Before Losani Homes can present your home to you, it must first pass our
internal quality assurance inspection.
Stage 15 - Pre-Delivery Inspection
Final inspection and power meter set. The home is now ready for the you
to see and explore.
At Losani Homes, it is our goal to build your home for you in a timely
fashion. Although we endeavor to keep on a regimented timeline, on occasion,
construction takes longer than projected. This could be for several reasons
including inclement weather, vendor workloads, backlogs, materials, or
unique requests for your home.
|